Services / Guide
A hire is priced on three lines: the suction excavator with operator, mobilisation and demobilisation, and the pre-site survey and planning. Send us the job and we quote within the working day.
3 lines
On every quote
Same working day
Quotes returned
Day, week, month
Hire periods
Frameworks
Agreed rates for repeat clients
| Line | What it covers |
|---|---|
| Suction excavator with operator | The machine and its operator on your site for the hire period, with the hoses, nozzles and extension pipes for the job. |
| Mobilisation and demobilisation | Bringing the machine to site and taking it away. |
| Pre-site survey and planning | The site walk, the review of utility drawings and the planning of the work before the truck arrives. |
| Factor | Why it matters |
|---|---|
| Duration | Hire runs by the day, the week or the month. |
| Ground and depth | Loose sand lifts faster than wet clay or packed gravel, and deep excavation needs extension pipes. Both set how much is dug in a shift. |
| Access | A truck beside the hole is the simple case. Long hose runs, a Brokk carrier or work inside a building add equipment and time. |
| Location | Mobilisation is priced from our Dubai warehouse to your site. |
| Site requirements | Inductions, permits, shift patterns and spoil disposal are set by the site. |
Two jobs with the same name are different jobs. A trial pit in open sand beside a road and a trial pit inside a live substation take different equipment and different time. We price the job you have, within the working day, so the number you plan with is the number on the invoice.
Swipe the table sideways to see every column.
| Suction excavation | Manual digging | |
|---|---|---|
| Live-utility safety | No mechanical contact with the asset | A shovel or pick can still strike the utility |
| Speed | Up to 150 m³ per day | Slow and hand-paced |
| Site footprint | Compact, fewer people, far less overhead | Crew, spoil and barriers across the site |
| Reinstatement | Narrow, neat excavation | Wider excavation to make good |
The day rate of the machine is one number. The cost of a strike, an outage or a week of hand digging is the number to compare it with.
Send it by WhatsApp or through the quote form. Repeat clients work on framework pricing agreed in advance.
Questions and answers
No. We quote each job within the working day, on three lines: the suction excavator with operator, mobilisation and demobilisation, and the pre-site survey and planning.
Yes. Every hire is a suction excavator with operator.
Yes. Mobilisation and demobilisation are a separate line on the quote.
Yes. Standing call-off frameworks with agreed pricing are available for repeat clients.
Get a quote
A location, a photo and what is buried there is enough to start. Quotes are returned within the working day.