Services / Utility location
A trial trench proves what is under the ground before the main works start. We open it with air, so the cables, pipes and ducts you are looking for come out intact, located and verified.
To the centimetre
Position and depth confirmed
No strikes
Air does the digging
Up to 150 m³
Excavated per day
Same shift
Backfilled and handed back
A narrow excavation cut across the expected line of buried services to confirm how many there are, where they run and how deep they sit. Trial pit, trial hole, slit trench and pothole are names for the same thing at different sizes.
An excavator bucket finds a cable by hitting it. Hand digging is slow and puts people in the trench. Suction removes the soil with air, so the services are exposed without contact and the crew works from the surface.
The excavation is narrow and clean-sided. There is less surface to break out and less to reinstate afterwards.
A locator or a ground-penetrating radar scan reads the ground from the surface and gives an indication. A trial trench shows the service itself: what it is, how big it is, how deep it sits and what condition it is in.
The two work together. The scan says where to look, and the trench proves what is there. Only the open trench finds the duct that is on no drawing and gave no signal.
Swipe the table sideways to see every column.
| Trial trench by suction | Trial trench by hand | |
|---|---|---|
| Risk to the services | No mechanical contact | A pick or shovel can still strike a cable |
| People | Operator at the surface | Diggers in the trench |
| Spoil | Into the tank on the truck | Heaped along the road |
| Trench | Narrow and clean-sided | Wider, with more to make good |
| Pace | Up to 150 m³ per day | Slow and hand-paced |
The services exposed and visible, their position and depth measured, photographs of the open trench, and a signed hand-back. The trench is then backfilled and compacted and the corridor returned in the same shift.
| Step | What happens |
|---|---|
| 1. Locate | Site walk with the asset owner. Drawings and records reviewed. Approvals in hand before the truck arrives. |
| 2. Open | Asphalt is cut or paving lifted. From there down, the soil is removed by air. |
| 3. Verify | Each service is exposed, identified, measured and photographed. |
| 4. Hand back | Backfill, compact, photograph and sign off. |
Questions and answers
Yes. The trench exposes everything that crosses its line, recorded or not. That is the reason to dig it before the main works.
Yes. We backfill, compact, photograph and sign off, and the corridor is returned in the same shift.
Yes. The truck parks alongside, the boom works a 180° sector without the truck moving, and the spoil goes into the tank instead of onto the road.
The location, the number of trenches, their length and depth, and what you expect to find. A photo of the site helps.