Services / Excavation
Narrow, clean-sided trenches for new cables, ducts and small-diameter pipe, cut along routes that already carry live services.
Up to 150 m³
Excavated per day
180°
Boom sector without moving the truck
10 / 12 m³
Spoil tank on the truck
Less to reinstate
Narrow, neat trench
When the route already has services in it. A new duct through an existing utility corridor crosses cables, pipes and fibre every few metres. An excavator has to stop at each one. Suction keeps going, because the air exposes each crossing without touching it.
Narrow and clean-sided, cut only as wide as the new service needs. Narrower trenches mean less asphalt or paving to break out and less to make good.
The spoil is lifted straight into the tank on the truck. There are no heaps along the road, no skip on site and no dust plume.
The Q20 excavates up to 150 m³ per day and its boom works a 180° sector without the truck moving, so a long section is opened from one parking position before the truck moves up.
Questions and answers
Yes. One machine excavates up to 150 m³ per day with fewer people in the trench.
Yes. That is where suction is used: the air exposes each existing service at the crossing without touching it.
Into the tank on the truck. It is tipped back as backfill or taken to the disposal point agreed in the quote.
We backfill and compact the trench. Surface reinstatement is agreed in the quote.
Get a quote
A location, a photo and what is buried there is enough to start. Quotes are returned within the working day.