Cable exposure by suction excavation

We expose live power cables, fibre and telecom ducts with air. Nothing rigid touches the cable, so the network stays live while the joint bay, diversion or repair goes ahead.

Buried cables and ducts exposed intact in the side of a suction-excavated trench

No contact

Nothing rigid touches the cable

6.5 m

Boom reach to the rear

180°

Working sector without moving the truck

Remote control

Operated from a safe distance

Why is a buried cable easy to damage?

A bucket tooth or a pick cuts a cable sheath in one movement. On a power cable that is an outage and an arc-flash risk. On a fibre route it is thousands of connections down. Hand tools are slower and carry the same risk.

Suction removes the soil around the cable with air. The cable is left lying in the open trench, intact, ready to be inspected, jointed or moved.

What cable work do you do?

  • Joint bays and jointing pits
  • Cable diversions ahead of road and building works
  • Fault location and repair access
  • Substation and transmission tie-ins, worked while live
  • Fibre backbone exposure and crossings for new routes
  • Clearing sand and silt from jointing bays and cable chambers

Which cables and ducts do you expose?

NetworkWhat is in the ground
Power distributionLow-voltage and 11 kV cables under streets and plots
Power transmission33 kV and 132 kV circuits with their pilot and fibre cables
TelecomsDuct banks, fibre backbone and street cabinets
Street servicesLighting, traffic signal and irrigation control cables
Plants and substationsEarthing grids, instrument and control cables

Does the network stay live?

Yes. Material is removed right alongside energised cables and nothing rigid contacts them. The operator controls the boom by radio remote from a safe distance, with a clear view of the nozzle.

What if the truck cannot get close?

The Q20 boom reaches 6.5 m to the rear and works a 180° sector without the truck moving. Beyond that, hose extensions take the suction further, and a remote-controlled Brokk 120DII carries the nozzle into places a heavy vehicle is not allowed, such as inside a substation compound.

How do you find the cable first?

With the asset owner. The site walk, drawings and records come first, and a trial trench confirms the position and depth before the full length is opened.

Questions and answers

Cable exposure: the short answers.

Can you expose a live high-voltage cable?

Yes. Air does the digging and nothing rigid contacts the cable. The work runs under the asset owner's permit and method.

Do you work on fibre and telecom routes?

Yes. Fibre backbone exposure and crossings for new and existing routes are regular work for suction excavation.

How much cable trench can you open in a day?

The machine excavates up to 150 m³ per day. The length that gives depends on the width and depth of the trench.

Do you backfill after the cable work is finished?

Yes. We backfill, compact, photograph and sign off.

Machines for this work

All equipment →

Related pages

All services →

Get a quote

Tell us where, what and when.

A location, a photo and what is buried there is enough to start. Quotes are returned within the working day.